Projects & Case Studies

Real results from real projects โ€” EPR compliance, GHG accounting, LCA, environmental approvals, EHS audits and more across Tamil Nadu and South India.

0+
Projects Completed
0+
Clients Served
0+
Years Experience
0
Service Verticals

Recent Project Highlights

Across industries and service areas โ€” a snapshot of how we deliver results for our clients.

EPR Compliance โ™ป๏ธ

EPR Registration for Plastic Packaging Manufacturer

๐Ÿญ Plastics & Packaging ยท Coimbatore
Challenge

A mid-size plastic packaging manufacturer was unaware of their EPR obligations under the Plastic Waste Management Rules 2022. They faced a regulatory notice from CPCB and risk of import restrictions.

Our Solution

Conducted EPR applicability assessment, registered the client on the CPCB EPR portal, developed their annual EPR plan with collection targets, and identified authorized PROs for fulfilment.

Result

Client successfully registered on CPCB portal within 3 weeks. EPR plan filed on time. Regulatory notice resolved with zero penalty.

EPR RegistrationCPCB PortalPlastic WastePWM Rules 2022
โœ“ Zero Penalty ยท Fully Compliant
Similar Project? โ†’
GHG & Carbon Accounting ๐Ÿ“Š

Scope 1, 2 & 3 GHG Inventory for Auto Components Exporter

๐Ÿš— Auto & Engineering ยท Madurai
Challenge

A Tier-1 auto components exporter faced mandatory carbon disclosure requests from their European OEM buyer. They had no prior GHG accounting experience and needed an ISO 14064-aligned inventory urgently.

Our Solution

Developed complete Scope 1 (fuel combustion, process), Scope 2 (purchased electricity), and Scope 3 (Category 1, 4, 11) GHG inventory per GHG Protocol. Prepared buyer-ready carbon disclosure report.

Result

GHG inventory completed in 5 weeks. Client successfully submitted carbon data to EU buyer and retained the export contract worth โ‚น12 Cr annually.

Scope 1 2 3ISO 14064GHG ProtocolExport Compliance
โœ“ Export Contract Retained ยท ISO 14064 Compliant
Similar Project? โ†’
Environmental Approvals ๐Ÿ›๏ธ

CTE & CTO Renewal for Pharmaceutical Unit

๐Ÿ’Š Pharmaceuticals ยท Chennai
Challenge

A pharmaceutical manufacturing unit had an expired CTO for over 6 months. TNPCB had issued a show-cause notice and the unit was at risk of closure. Previous consultant had abandoned mid-process.

Our Solution

Took over the complete CTO renewal process โ€” prepared compliance status report, effluent quality data, stack emission reports and submitted the renewal application on TNPCB portal with all required annexures.

Result

CTO renewed within 45 days. Show-cause notice withdrawn after compliance submission. Unit continued operations without interruption.

CTO RenewalTNPCBShow-Cause ResolutionPharma Compliance
โœ“ Notice Withdrawn ยท CTO Renewed in 45 Days
Similar Project? โ†’
LCA & PCF Studies ๐Ÿ”ฌ

LCA Study for Garment Exporter โ€” EU Buyer Requirement

๐Ÿ‘— Textiles & Garments ยท Tirupur
Challenge

A Tirupur-based garment exporter received a mandatory LCA questionnaire from their German retail buyer as part of the brand's 2025 supplier sustainability program. Non-submission would mean loss of the season's orders.

Our Solution

Conducted a cradle-to-gate LCA per ISO 14040/44 covering cotton farming, spinning, dyeing, finishing and cut-make-trim stages. Identified carbon and water hotspots. Prepared buyer-ready LCA summary report.

Result

LCA study delivered in 6 weeks. Client submitted to buyer and was shortlisted for the buyer's preferred supplier program. Water hotspots identified led to 18% reduction in process water use.

ISO 14040Cradle-to-GateTirupurEU BuyerTextile LCA
โœ“ Preferred Supplier Status ยท 18% Water Reduction
Similar Project? โ†’
EHS Management & Audits ๐Ÿ›ก๏ธ

EHS Audit & ISO 45001 Gap Assessment โ€” Food Processing

๐Ÿฑ Food Processing ยท Trichy
Challenge

A food processing plant with 350 workers had no formal EHS system. A near-miss incident involving a machinery entanglement triggered a Factories Inspector visit. Management needed immediate corrective action.

Our Solution

Conducted comprehensive EHS audit against Factories Act 1948 and ISO 45001:2018. Identified 47 non-conformances. Developed prioritized corrective action plan, HIRA for all work areas, machine guarding SOP and emergency response plan.

Result

Critical non-conformances resolved within 30 days. ISO 45001 gap closed to 78% in 3 months. Factory Inspector follow-up visit cleared with no enforcement action.

ISO 45001Factories ActHIRAEHS AuditFood Safety
โœ“ Inspector Clearance ยท ISO 45001 Gap Closed 78%
Similar Project? โ†’
Water Audit ๐Ÿ’ง

Water Audit & Footprint for Textile Dyeing Unit

๐ŸŽจ Textile Dyeing ยท Erode
Challenge

A textile dyeing unit in Erode consuming 1,200 KLD of freshwater faced pressure from their buyer's water stewardship program and TNPCB's effluent compliance requirements simultaneously.

Our Solution

Conducted full process water audit with temporary metering across all dyeing, washing and finishing baths. Prepared water balance and ISO 14046 water footprint per kg of fabric. Identified recycling and reuse opportunities.

Result

Water consumption reduced by 22% (264 KLD/day) through recycling recommendations. Annual water cost savings of โ‚น18 lakhs. Buyer water questionnaire submitted successfully.

ISO 14046Water FootprintTextileWater ReductionErode
โœ“ 22% Water Reduction ยท โ‚น18L Annual Savings
Similar Project? โ†’
Carbon Sequestration ๐ŸŒณ

Miyawaki Forest Development for Cement Plant

๐Ÿ—๏ธ Cement & Mining ยท Salem
Challenge

A cement plant in Salem required green belt development as part of their Environmental Clearance (EC) conditions. They also wanted the plantation to contribute to their voluntary carbon offset program.

Our Solution

Designed a 5-acre Miyawaki dense forest using 18 native species at 3 plants/sqm density. Supervised plantation, installed drip irrigation, and set up annual biomass monitoring for carbon stock quantification.

Result

5 acres of Miyawaki forest established with 98% survival rate at 6 months. EC compliance condition fulfilled. Estimated sequestration of 45 tonnes COโ‚‚e per year once mature.

Miyawaki MethodCarbon SequestrationGreen BeltEC ComplianceSalem
โœ“ EC Condition Fulfilled ยท 45t COโ‚‚e/yr Sequestration
Similar Project? โ†’
ESG & BRSR Reporting ๐Ÿ“ˆ

BRSR Core Report for Listed Manufacturer

๐Ÿข Listed Manufacturing Company ยท Chennai
Challenge

A BSE-listed manufacturer was mandated to submit BRSR Core with third-party assurance for FY2024-25. They had no ESG data infrastructure, no prior sustainability reporting, and a 3-month deadline.

Our Solution

Conducted ESG materiality assessment, designed data collection templates for all 9 BRSR principles, collected and verified 3-year baseline data, and prepared the complete BRSR Core report with assurance-ready data trails.

Result

BRSR Core report submitted on time to BSE. First-time submission received positive feedback from institutional investors. ESG rating improved from C to B+ within one reporting cycle.

BRSR CoreSEBI MandateESG RatingListed CompanyAssurance
โœ“ On-Time Submission ยท ESG Rating C to B+
Similar Project? โ†’
EPR Compliance ๐Ÿ”‹

E-Waste & Battery EPR Compliance for Electronics Importer

๐Ÿ’ป Electronics & IT ยท Madurai
Challenge

An electronics importer bringing in laptops, phones and UPS batteries had dual EPR obligations โ€” E-Waste Management Rules and Battery Waste Management Rules 2022 โ€” but had registered for neither.

Our Solution

Completed dual EPR registration on CPCB portal for both e-waste and battery EPR categories. Developed EPR plan with collection targets, identified authorized e-waste recyclers and battery recyclers, and filed first annual returns.

Result

Both EPR registrations completed in 4 weeks. Annual EPR targets set and channel partners onboarded. Client is now fully compliant with zero risk of import restrictions.

E-Waste EPRBattery EPRCPCB Dual RegistrationElectronics
โœ“ Dual EPR Compliance ยท Zero Import Risk
Similar Project? โ†’

How Every Project Gets Done

A consistent, transparent process across every service and industry.

01
Free Consultation

Understand your compliance needs, assess applicability and define scope.

02
Site Assessment

On-site visit, data collection and gap analysis against regulations.

03
Solution Design

Tailored compliance plan with timeline, deliverables and cost estimate.

04
Implementation

On-ground execution โ€” documentation, submissions, portal filings and follow-ups.

05
Delivery & Report

Final compliance certificate, report or approval with full documentation handover.

06
Ongoing Support

Annual renewals, compliance monitoring and regulatory update alerts.

What Our Clients Say

โ˜…โ˜…โ˜…โ˜…โ˜…

"Insight Industrial Services resolved our lapsed CTO issue in record time. Their understanding of TNPCB processes and documentation is exceptional. Our unit avoided closure thanks to their swift action."

SK
S. Karthikeyan
Director, Pharma Manufacturing, Chennai
โ˜…โ˜…โ˜…โ˜…โ˜…

"The LCA study they prepared for us was accepted by our German buyer without a single revision request. The level of detail and ISO 14040 compliance was impressive. Highly professional team."

RP
R. Prabakaran
MD, Garment Exporter, Tirupur
โ˜…โ˜…โ˜…โ˜…โ˜…

"From EPR registration to annual return filing โ€” Insight Industrial handled everything seamlessly. We were completely new to EPR and their team guided us step by step. Couldn't have done it without them."

AL
A. Lakshmi
GM Compliance, FMCG Manufacturer, Madurai
โ˜…โ˜…โ˜…โ˜…โ˜…
GHG & Carbon Accounting

"We engaged Insight Industrial for our Scope 3 GHG inventory as part of our SBTi commitment. Their team's knowledge of GHG Protocol and category-wise Scope 3 data collection was outstanding. The report was accepted by SBTi in the first submission."

VN
V. Natarajan
Sustainability Head, Textile Manufacturer, Erode
โ˜…โ˜…โ˜…โ˜…โ˜…
Environmental Approvals

"Insight Industrial handled our Environmental Clearance application for our new cement plant expansion through PARIVESH. Their EIA documentation and TNPCB coordination was flawless. EC received in 4 months โ€” much faster than we expected."

BM
B. Murugesan
MD, Cement & Construction, Salem
โ˜…โ˜…โ˜…โ˜…โ˜…
EHS Management

"After a serious near-miss at our plant, we brought in Insight Industrial for a complete EHS overhaul. They redesigned our safety systems, trained our workforce, and helped us achieve ISO 45001 certification within 8 months. Zero LTIs since implementation."

TR
T. Ramachandran
Plant Head, Food Processing Unit, Trichy

Have a Similar Compliance Challenge?

Tell us about your project and we'll design the right solution โ€” free initial consultation, no obligation.

Get Free Quote โ†’ ๐Ÿ“ž +91 63690 83373
๐Ÿ’ฌ Enquire Now